Wishlist

24 m Roof-Mounted Guyed Tower Kit with Electro-Galvanized STZ30 Section (Guy wires not included).

  • $ 25,699.00
  • Brand: SYSCOM TOWERS
  • Availability: Out of stock
  • SKU: KTZ-30E-024P

Key Features Product manufactured under ISO 9001:2015 standards High elevation / Low cost 100% assembly inspection section by section Electrogalvanized in accordance with ASTM B-633 standards Ideal for dry, corrosion-free...

Tags: categoria:Redes e IT , marca:SYSCOM TOWERS , proveedor:Syscom , Redes Y Conectividad , sku:KTZ-30E-024P , supplier:Syscom , syscom

Key Features

  • Product manufactured under ISO 9001:2015 standards
  • High elevation / Low cost
  • 100% assembly inspection section by section
  • Electrogalvanized in accordance with ASTM B-633 standards
  • Ideal for dry, corrosion-free areas

Physical Characteristics

  • Maximum Axial Load: 200 kg
  • Height: 24 meters (8 sections)
  • Wind Resistance: 200 km/hr
  • Anti-corrosive protection: Electrogalvanized (ASTM B-633)
  • Application: Outdoor (desert areas or low humidity)
Includes the following components
  • 8 x STZ30 - 30 cm face width tower section
  • 1 x SCZ30P - 30 cm tower top with lightning rod set screw
  • 1 x SBA30 - 30 cm tower base
  • 1 x SAB30 - Tower base anchor
  • 4 x SJB30 - Guy wire clamp flange
  • 3 x SAP01 - Slab or wall anchor for guy wire
  • 24 x CUELLO-14-HDG - Guy wire thimble
  • 72 x NUDO-316-FJG - 3/16" wire rope clip

Guy wire not included. 315 meters of 1/8" guy wire (SRET-318-CAM) or larger diameters are recommended.

Turnbuckles not included. 12 1/2" x 6" turnbuckles are recommended (TEN1/2X6OGJ or TEN1/2X6OQJ).

**Failure to use installation accessories such as flanges, tower base, tower anchor, or guy wire anchors will be considered a voiding of the equipment warranty, and any additional modifications are the installer's responsibility.**

Complementary Accessories

Signaling/Lighting System

  • 2 x EIGSLSE - Self-contained LED strobe with photocell, solar panel, and battery. Type L810
  • 2 x HLU3R2 - Mounting for EIGSLSE obstruction light

*Signaling standards dictate that the tower must be painted in 7 equal-sized bands; 4 in reddish-orange and 3 in white.

Lifeline System

  • 1 x SHE-LV - Pair of mounting hardware
  • 1 x S-GULV - Cable guide
  • 27 x SRET-338CAM - 3/8" wire rope
  • 6 x NUDO-38FJG - 3/8" forged wire rope clip
  • 2 x CUELLO-38-HDG - 3/8" thimble
  • 1 x TRY-ACC-SLIDER - Safety slider for installer (Optional)
  • 1 x SYS-USA7B - Suspension harness (Optional)

*NOM-009 mandates the use of systems that arrest accidental falls on a structure.

Grounding and Lightning Protection System

New! Lightning rod + Grounding kit with cable (Brand: LINKEDPRO, not included)

KLP-TZ24-PRO - All-inclusive! Ideal for 24m towers with corona dipole, cabling, and electrodes.

Alternatively, you can quote the following grounding or lightning rod components individually:

Recommended Grounding System

  • 1 x TG45AB - 45A grounding electrode with electrode, filter, and H2Ohm compound
  • 1 x S610 - Plastic inspection well
  • 3 x TGCR11 - Eye connector
  • 2 x TGAB18 - Rod connector
  • 1 x TGBUSG10 - 1000A capacity grounding bar with insulators (no enclosure)

Recommended Basic Lightning Rod System

  • 1 x TGTDPC - Lightning rod tip with aluminum mast (MASTIL1.2)
  • 1 x TG45AB - 45 Amp electrode with a bag of impedance-improving compound (H2OHM), compass, and level
  • 1 x S610 - Small plastic inspection well
  • 1 x ANTIOX - Protective spray for terminals
  • 3 x TGCR11 - Eye connector
  • 2 x TGAB18 - Rod connector
  • 16 x TGAC - Tower insulator

*The dipole-type tip offers a 72° protection cone under the coil. Recommended for areas with low lightning incidence.

*2/0 AWG copper cable is recommended for integration (SLY-346-BLK). Considering a maximum electrode installation distance of 3 meters from the tower, approximately 8 meters are used.


Representative Diagram: Guy Wire Installation Version 2.0

Installation Images

Recommendations

  • Ensure installation is performed by a trained professional.
  • Schedule a maintenance plan to check guy wire tension and tighten hardware.
  • Do not install solar panels higher than 6 meters. Check compatibility between solar cells and mounts.
  • A structural stress study must be performed when an eccentric load is placed on the tower. This can cause excessive torque and bending, leading to structural failure.
  • The tower must be painted in reddish-orange and white, in 7 bands of equal height, starting and ending in reddish-orange (SYSCOM does not provide tower painting services).
  • It is recommended to illuminate at least the top of the tower with a red light.

View Grounding + Lightning Rod Connection Diagram

Recently viewed