Wishlist

12 m Floor-Mounted Guyed Tower Kit with Electro-Galvanized STZ35 Section (Guy wires not included).

  • $ 22,199.00
  • Brand: SYSCOM TOWERS
  • Availability: In stock
  • SKU: KTZ-35E-012

Key Features Product manufactured under ISO 9001:2015 standards High Elevation / Low cost 100% Section-by-Section Assembly Inspection Electrolytic Galvanized in accordance with ASTM B-633 standards Ideal for dry, corrosion-free areas...

Tags: categoria:Redes e IT , marca:SYSCOM TOWERS , proveedor:Syscom , Redes Y Conectividad , sku:KTZ-35E-012 , supplier:Syscom , syscom

Logo SYSCOM TOWERS

Key Features

  • Product manufactured under ISO 9001:2015 standards
  • High Elevation / Low cost
  • 100% Section-by-Section Assembly Inspection
  • Electrolytic Galvanized in accordance with ASTM B-633 standards
  • Ideal for dry, corrosion-free areas

Physical Characteristics

  • Maximum Axial Load: 350 kg
  • Height: 12 meters (4 sections)
  • Wind Resistance: 200 km/h
  • Anti-corrosive protection: Electrolytic Galvanizing (ASTM B-633)
  • Application: Outdoors (Desert or low-humidity areas)

Includes the following components

Quantity Model Description
4 STZ35 35 cm face-width tower section
1 SCZ35P 35 cm tower top with set screw for lightning rod
1 SBZ35 35 cm tower base
1 SAB45 Anchor for 35/45 tower base
2 SJB35 Guy wire attachment bracket
3 SAZ45 Floor anchor for guy wire
12 CUELLO-14-HDG Thimble for guy wire
36 NUDO-316-FJG 3/16' cable clamp

Guy wire not included. 95 meters of 3/16' guy wire (SRET-474-CAM or SRET-316-DA) or larger diameters are recommended.

Turnbuckles not included. 6 turnbuckles of 5/8' x 9' are recommended (TEN5/8X9OGJ or TEN5/8X9OQJ).

Failure to use installation accessories such as brackets, tower base, tower anchor, or guy wire anchors results in loss of product warranty, and any additional modifications remain the responsibility of the installer.

Supplementary accessories (Not included)

Signaling/Lighting System (Not included)

Quantity Model Description
2 EIGSLSE Autonomous LED strobe with photocell, solar panel, and battery. L810 type
2 HLU3R2 Mounting for EIGSLSE obstruction light

*Signaling standards dictate that the tower must be painted in 7 equally-sized bands; 4 bands in reddish-orange and 3 in white.

Lifeline system (Not included)

Quantity Model Description
1 SHE-LV Pair of fastening hardware
1 S-GULV Line guide
15 SRET-338CAM 3/8' cable
6 NUDO-38FJG 3/8' forged cable clamp
2 CUELLO-38-HDG 3/8' thimble
1 TRY-ACC-SLIDER (Optional) Safety slider for installer
1 SYS-USA7B (Optional) Suspension harness

*NOM-009 mandates the use of systems that prevent accidental falls on a structure.

Grounding system recommended for the tower and mounted equipment (Not included)

Quantity Model Description
1 TG45AB 45A grounding electrode with electrode, filter, and H2Ohm compound
1 S610 Plastic access box
3 TGCR11 Eye connector
2 TGAB18 Rod connector
1 TGBUSG10 Bonding bar with 1000A capacity insulators (No cabinet)

* The use of 4 AWG insulated copper cable (SLY-287-GRN) is recommended for grounding from the electrode to the tower. For equipment on the tower, 6 AWG cable (SLY-291-GRN) can be used.

Basic lightning protection system recommended for the tower (Not included)

Quantity Model Description
1 TGTDPC Lightning rod tip with aluminum mast (MASTIL1.2)
1 TG45AB 45 Amp. electrode. With one bag of impedance-improving compound (H2OHM), compass, and level
1 S610 Small plastic inspection box
1 ANTIOX Terminal protection spray
3 TGCR11 Eye connector
2 TGAB18 Rod connector
8 TGAC114 Tower insulator

*The dipole tip offers a 72° protection cone under the coil. Recommended for areas with low lightning incidence.
*2/0 gauge copper cable is recommended for integration (SLY-346-BLK). Considering the electrode is installed at a maximum of 3 meters from the tower, approx. 8 meters are used.

See the Physical Ground + Lightning Rod connection diagram in the following DIAGRAM.

Recommendations

  • Ensure the installation is performed by a trained professional
  • Schedule a maintenance plan to check guy wire tension and tighten hardware
  • Do not install solar panels at a height greater than 6 meters. Verify compatibility between solar cells and mounts
  • A stress study must be performed when placing an eccentric load on the tower. This can cause excessive twisting and bending in the tower, leading to structural failure
  • The tower must be painted in orange-red and white tones, in 7 strips of equal height starting and ending with orange-red (SYSCOM does not perform tower painting)
  • It is recommended to illuminate the tower at least at the tip with a red lamp

Representative Diagram: Guy Wire Installation Version 2.0

Guy Wire Installation Diagram

Installation Images

Installation Images

Recently viewed