Skip to product information
1 of 1

SYSCOM TOWERS

12 m Floor-Mounted Guyed Tower Kit with Hot-Dip Galvanized STZ35G Section (Guy wires not included).

12 m Floor-Mounted Guyed Tower Kit with Hot-Dip Galvanized STZ35G Section (Guy wires not included).

Regular price $ 27,899.00
Regular price Sale price $ 27,899.00
Sale Sold out
Taxes included. Shipping calculated at checkout.
Quantity
Vendido por Glaretum, Proveedor de Servicio Autorizado Apple Paga con tarjeta, Apple Pay o PayPal ¿Dudas? Escríbenos por WhatsApp o llama al 800 461 0096

SYSCOM TOWERS Logo

Highlighted Features:

  • Product manufactured under ISO 9001:2015 standards.
  • High elevation / Low cost.
  • 100% inspection of section-by-section assembly.
  • Hot-dip galvanized in accordance with NMX-H-004-SCFI-2008
  • Ideal for high-humidity coastal areas or industrial zones.

Physical Characteristics:

  • Maximum Axial Load: 350 kg.
  • Height: 12 meters (4 sections).
  • Wind resistance: 200 km/h.
  • Anti-corrosion protection: Hot-dip galvanized (NMX-H-004-SCFI-2008).
  • Application: Outdoors (Humid areas).

Includes the following components:

Quantity Model Description
4 STZ35G 35 cm face width tower section.
1 SCZ35PG 35 cm tower top with lightning rod set screw.
1 SBZ35G Base for 35 cm tower.
1 SAB45G Anchor for 35/45 tower base.
2 SJB35G Guy wire attachment collar.
3 SAZ45G Ground anchor for guy wire.
12 CUELLO-14-HDG Thimble for guy wire
36 NUDO-316-FJG 3/16' cable clamp.

Guy wire not included. 95 meters of 3/16' guy wire (SRET-474-CAM or SRET-316-DA) or larger diameters are recommended.

Turnbuckles not included. 6 turnbuckles of 5/8' x 9' are recommended. (TEN5/8X9OGJ or TEN5/8X9OQJ).

Failure to use installation accessories such as Collars, Tower Base, Tower Anchor, or Guy Anchors will void the equipment warranty, and any additional modifications are the sole responsibility of the installer.


Complementary Accessories (Not included)

Signaling/Lighting System (Not included)

Quantity Model Description
2 EIGSLSE Self-contained LED strobe with photocell, solar panel, and battery. Type L810.
2 HLU3R2 Mount for EIGSLSE obstruction light

*Signaling regulations dictate that the tower must be painted with 7 equal-sized bands; 4 in orange-red tone and 3 in white.

Lifeline System (Not included)

Quantity Model Description
1 SHE-LV Pair of mounting brackets
1 S-GULV Line guide
15 SRET-338CAM 3/8' cable
6 NUDO-38FJG 3/8' forged clamp
2 CUELLO-38-HDG 3/8' thimble
1 TRY-ACC-SLIDER (Optional) Safety slider for installer.
1 SYS-USA7B (Optional) Suspension harness.

*NOM-009 mandates the use of systems that arrest accidental falls on a structure.

Recommended Grounding System for Tower and Equipment Mounted on it (Not included)

Quantity Model Description
1 TG45AB 45 A grounding electrode with Electrode, Filter, and H2Ohm compound
1 S610 Plastic access box.
3 TGCR11 Eye connector
2 TGAB18 Rod connector
1 TGBUSG10 1000A capacity ground bus bar with insulators (No cabinet)

* It is recommended to use 4 AWG insulated copper cable (SLY-287-GRN) to ground the electrode to the tower. For equipment on the tower, 6 AWG (SLY-291-GRN) can be used.

Recommended Basic Lightning Protection System for Tower (Not included)

Quantity Model Description
1 PARARRAYO Basic lightning rod.
1 TGTDPC Lightning rod tip with aluminum mast (MASTIL1.2) 1 TG45AB 45 Amp electrode. Includes a bag of impedance improvement compound (H2OHM), compass, and level. 1 S610 Small plastic inspection box. 1 ANTIOX Aerosol for terminal protection. 3 TGCR11 Eye connector. 2 TGAB18 Rod connector. 8 TGAC114 Tower insulator.

*The dipole-type tip offers a 72° protection cone under the coil. Recommended for low lightning incidence areas.
*2/0 gauge copper cable is recommended for integration (SLY-346-BLK). Considering a maximum electrode installation distance of 3 meters from the tower, approx. 8 meters are used.

See the Physical Ground + Lightning Rod connection diagram in the following DIAGRAM.

Recommendations:

  • Ensure the installation is performed by a trained professional.
  • Schedule a maintenance plan for checking guy wire tension and adjusting fasteners.
  • Do not install solar panels at a height greater than 6 meters. Check compatibility between solar cells and mounts.
  • A stress analysis must be performed when an eccentric load is placed on the tower. This can cause excessive twisting and bending in the tower, leading to structural failures.
  • The tower must be painted in orange-red and white, in 7 stripes of equal height starting and ending in orange-red (SYSCOM does not perform tower painting).
  • It is recommended to illuminate the tower at least at the tip with a red lamp.

Representative Diagram: Guy Wire Installation Version 2.0

Guy wire installation diagram

Installation Images

Installation images
View full details