Wishlist

18 m Floor-Mounted Guyed Tower Kit with Electro-Galvanized STZ35 Section (Guy wires not included).

  • $ 28,499.00
  • Brand: SYSCOM TOWERS
  • Availability: In stock
  • SKU: KTZ-35E-018

Key Features: Product manufactured under ISO 9001:2015 standard High elevation / Low cost. 100% Inspection of section-by-section assembly. Electrolytic galvanization according to ASTM B-633 standard. Ideal for dry, corrosion-free areas...

Tags: categoria:Redes e IT , marca:SYSCOM TOWERS , proveedor:Syscom , Redes Y Conectividad , sku:KTZ-35E-018 , supplier:Syscom , syscom

SYSCOM TOWERS

Key Features:

  • Product manufactured under ISO 9001:2015 standard
  • High elevation / Low cost.
  • 100% Inspection of section-by-section assembly.
  • Electrolytic galvanization according to ASTM B-633 standard.
  • Ideal for dry, corrosion-free areas

Physical Characteristics:

  • Maximum Axial Load: 350 kg.
  • Height: 18 meters (6 sections).
  • Wind resistance: 200 km/h.
  • Anti-corrosion protection: Electrolytic Galvanization (ASTM B-633).
  • Application: Outdoor (Desert or low humidity areas)

Includes the following components:

Quantity Model Description
6 STZ35 Tower section, 35 cm face width.
1 SCZ35P 35 cm tower top with set screw for lightning rod.
1 SBZ35 35 cm tower base.
1 SAB45 Anchor for 35/45 tower base.
2 SJB35 Guy wire attachment flange.
3 SAZ45 Floor anchor for guy wire.
12 CUELLO-14-HDG Thimble for guy wire
36 NUDO-316-FJG 3/16' cable clamp.

Guy wire not included. We recommend 130 meters of 3/16' guy wire (SRET-474-CAM or SRET-316-DA ) or larger diameters.

Turnbuckles not included. We recommend 6 turnbuckles of 5/8' x 9'. (TEN5/8X9OGJ or TEN5/8X9OQJ).

*Failure to use installation accessories such as flanges, tower base, tower anchor, or guy anchors will void the equipment warranty, and any additional adaptation is the installer's responsibility.


Complementary accessories (Not included):

Signaling/Lighting System (Not included):

Quantity Model Description
2 EIGSLSE Autonomous LED strobe with photocell, solar panel, and battery. Type L810.
2 HLU3R2 Mount for EIGSLSE obstruction lamp

*The signaling standard dictates that the tower must be painted in 7 equal-sized bands; 4 bands in reddish-orange and 3 in white.

Lifeline System (Not included):

Quantity Model Description
1 SHE-LV Pair of attachment hardware
1 S-GULV Line guide
21 SRET-338CAM 3/8' cable
6 NUDO-38FJG 3/8' forged cable clamp
2 CUELLO-38-HDG 3/8' thimble
1 TRY-ACC-SLIDER (Optional) Safety slider for installer.
1 SYS-USA7B (Optional) Suspension harness.

*NOM-009 mandates the use of systems to prevent accidental falls on a structure.

Physical Grounding System Recommended for Tower and Equipment mounted on it (Not included):

Quantity Model Description
1 TG45AB 45A grounding electrode with electrode, filter, and H2Ohm compound
1 S610 Plastic inspection pit.
3 TGCR11 Eye connector
2 TGAB18 Rod connector
1 TGBUSG10 Grounding bus bar with 1000A capacity insulators (No cabinet)

* We recommend using 4 AWG insulated copper cable (SLY-287-GRN) for grounding from the electrode to the tower. For equipment on the tower, you may use 6 AWG (SLY-291-GRN).


Basic Lightning Rod System Recommended for Tower (Not included):

Quantity Model Description
1 TGTDPC Lightning rod tip with aluminum mast (MASTIL1.2)
1 TG45AB 45 Amp electrode. With one bag of impedance-improving compound (H2OHM), compass, and level.
1 S610 Small plastic inspection well.
1 ANTIOX Aerosol for terminal protection.
3 TGCR11 Eye connector.
2 TGAB18 Rod connector.
12 TGAC114 Tower insulator.

*The dipole-type tip provides a 72° protection cone under the coil. Recommended for low lightning incidence zones.
*2/0 gauge copper cable is recommended for integration (SLY-346-BLK). Considering a maximum installation distance of 3 meters for the electrode from the tower, approx. 8 meters are used.

View the physical grounding + lightning rod connection diagram in the following DIAGRAM.


Recommendations:

  • Ensure the installation is performed by a trained professional.
  • Schedule a maintenance plan to check guy wire tension and tighten hardware.
  • Do not install solar panels at a height greater than 6 meters. Check the compatibility between solar cells and mounts.
  • A stress study must be conducted when placing an eccentric load on the tower. This can cause excessive twisting and bending in the tower, leading to structural failure.
  • The tower must be painted in an orange-red and white tone, in 7 stripes of equal height, starting and ending with orange-red (SYSCOM does not perform tower painting).
  • It is recommended to light the tower at least at the tip with a red lamp.

Representative Diagram: Guy Wire Installation Version 2.0

Guy Wire Installation Diagram

Installation Images

Installation Images

Recently viewed