Wishlist

21 m Floor-Mounted Guyed Tower Kit with Hot-Dip Galvanized STZ45G Section (Guy wires not included).

  • $ 50,899.00
  • Brand: SYSCOM TOWERS
  • Availability: 9 In stock
  • SKU: KTZ-45G-021

Key Features Product manufactured under ISO 9001:2015 standard High elevation / Low cost 100% Section-by-section assembly inspection Hot-dip galvanized according to NMX-H-004-SCFI-2008 Ideal for coastal areas with high humidity or...

Tags: categoria:Redes e IT , marca:SYSCOM TOWERS , proveedor:Syscom , Redes Y Conectividad , sku:KTZ-45G-021 , supplier:Syscom , syscom

Logo SYSCOM TOWERS

Key Features

  • Product manufactured under ISO 9001:2015 standard
  • High elevation / Low cost
  • 100% Section-by-section assembly inspection
  • Hot-dip galvanized according to NMX-H-004-SCFI-2008
  • Ideal for coastal areas with high humidity or industrial zones

Physical Characteristics

  • Maximum Axial Load: 500 Kg
  • Height: 21 meters (7 sections)
  • Wind resistance: 200 km/hr
  • Anti-corrosive protection: Hot-dip galvanized (NMX-H-004-SCFI-2008)
  • Application: Outdoor (Humid zones)

Includes the following components

Quantity Model Description
7 STZ45G 45 cm face width tower section
1 SCZ45G 45 cm tower top with lightning rod clamp
1 SBZ45G Base for 45 cm tower
1 SAB45G Anchor for 35/45 tower base
3 SJB45G Guy wire clamp
3 SAZ45G Ground anchor for guy wire
18 CUELLO-14-HDG Thimble for guy wire
54 NUDO-14-FJG 1/4' wire rope clip

Does not include guy wire. 215 meters of 1/4' guy wire (SRET-635-CAM) or higher diameters are recommended.

Does not include turnbuckles. 9 turnbuckles of 5/8' x 9' are recommended. (TEN5/8X9OGJ or TEN5/8X9OQJ).

*Failure to use installation accessories such as clamps, tower base, tower anchor, or guy wire anchors results in the loss of equipment warranty, and any additional adaptation is the responsibility of the installer.

Complementary accessories (Not included)

Signaling/Lighting System (Not included)

Quantity Model Description
2 EIGSLSE Autonomous LED strobe light with photocell, solar panel, and battery. Type L810
2 HLU3R2 Mount for EIGSLSE obstruction light

*The signaling standard dictates that the tower must be painted in 7 equal-sized bands; 4 bands in reddish-orange and 3 in white.

Lifeline system (Not included)

Quantity Model Description
1 SHE-LV Pair of mounting brackets
1 S-GULV Line guide
24 SRET-338CAM 3/8' cable
6 NUDO-38FJG 3/8' forged wire rope clip
2 CUELLO-38-HDG 3/8' thimble
1 TRY-ACC-SLIDER (Optional) Safety slider for installer
1 SYS-USA7B (Optional) Suspension harness

*NOM-009 mandates the use of systems to arrest accidental falls on a structure.

Physical Grounding System Recommended for Tower and Mounted Equipment (Not included)

Quantity Model Description
1 TG45AB 45 A grounding electrode with electrode, filter, and H2Ohm compound
1 S610 Plastic access box
3 TGCR11 Eye connector
2 TGAB18 Rod connector
1 TGBUSG10 Grounding bar with insulators, 1000A capacity (without cabinet)

* The use of 4 AWG coated copper cable (SLY-287-GRN) is recommended for connecting the electrode to the tower. For equipment on the tower, 6 AWG (SLY-291-GRN) can be used.

Basic Lightning Protection System Recommended for Tower (Not included)

Quantity Model Description
1 TGTDPC Lightning Rod Tip with Aluminum Mast (MASTIL1.2)
1 TG45AB 45 Amp Electrode. Includes a bag of impedance-improving compound (H2OHM), compass, and level
1 S610 Small plastic inspection box
1 ANTIOX Aerosol for terminal protection
3 TGCR11 Eye Connector
2 TGAB18 Rod Connector
14 TGAC114 Tower Insulator

*The dipole-type tip offers a 72° protection cone below the coil. It is recommended for areas with low lightning incidence.

*2/0 gauge copper cable is recommended for integration (SLY-346-BLK). Considering an electrode installation at a maximum of 3 meters from the tower, approximately 8 meters are used.

View Physical Ground + Lightning Rod connection diagram

Recommendations:

  • Ensure that the installation is performed by a trained professional
  • Schedule a maintenance plan for checking guy wire tension and tightening hardware
  • Do not install solar panels more than 6 meters high. Check for compatibility between solar cells and mounts
  • A stress study must be performed when placing an eccentric load on the tower. This can cause excessive twisting and bending in the tower, leading to structural failures
  • The tower must be painted in orange-red and white tones, in 7 stripes of equal height starting and ending with orange-red (SYSCOM does not perform tower painting)
  • It is recommended to illuminate the tower at least at the tip with a red lamp

Representative Diagram: Guy Wire Installation Version 2.0

Guy wire installation diagram

Installation Images

Installation images

Recently viewed