Skip to product information
1 of 1

SYSCOM TOWERS

3 m Floor-Mounted Guyed Tower Kit with Electro-Galvanized STZ30 Section (Guy wire not included).

3 m Floor-Mounted Guyed Tower Kit with Electro-Galvanized STZ30 Section (Guy wire not included).

Regular price $ 5,699.00
Regular price Sale price $ 5,699.00
Sale Sold out
Taxes included. Shipping calculated at checkout.
Quantity
Vendido por Glaretum, Proveedor de Servicio Autorizado Apple Paga con tarjeta, Apple Pay o PayPal ¿Dudas? Escríbenos por WhatsApp o llama al 800 461 0096

SYSCOM TOWERS Logo

Key Features

  • Product manufactured under ISO 9001:2015 Standards
  • High Elevation / Low cost
  • 100% Section-by-Section Assembly Inspection
  • Electrolytic Galvanization in accordance with ASTM B-633 standards
  • Ideal for dry, corrosion-free areas

Physical Characteristics

  • Maximum Axial Load: 200 Kg
  • Height: 3 meters (1 section)
  • Wind resistance: 200 km/h
  • Anti-corrosive protection: Electrolytic Galvanization (ASTM B-633)
  • Application: Outdoor (Desert or low-humidity areas)

Includes the following components

Components
Quantity Model Description
1 STZ30 30 cm face tower section
1 SCZ30P 30 cm tower top cap with lightning rod set screw
1 SBA30 Base for 30 cm tower
1 SAB30 Anchor for tower base
1 SJB30 Guy wire attachment flange
3 SAP02 Floor anchor for guy wire
6 CUELLO-14-HDG Thimble for guy wire
18 NUDO-316-FJG 3/16" wire rope clip

Does not include guy wire.

20 meters of 1/8" guy wire (SRET-318-CAM) or larger diameters are recommended.

Does not include turnbuckles.

3 turnbuckles of 1/2' x 6' are recommended. (TEN1/2X6OGJ or TEN1/2X6OQJ).

**Failure to use installation accessories such as flanges, tower base, tower anchor, or guy anchors is considered a voiding of the equipment warranty, and any additional adaptation is the responsibility of the installer.**

Complementary accessories (Not included)

Signaling/Lighting System (Not included)

Components
Quantity Model Description
2 EIGSLSE Autonomous LED strobe with photocell, solar panel, and battery. Type L810
2 HLU3R2 Mount for EIGSLSE obstruction light

*Signaling regulations dictate that the tower must be painted in 7 bands of equal size; 4 bands in reddish-orange tone and 3 in white.

Lifeline system (Not included)

Components
Quantity Model Description
1 SHE-LV Pair of mounting brackets
1 S-GULV Line guide
5 SRET-338 3/8" cable
6 NUDO-38FJG 3/8" forged wire rope clip
2 CUELLO-38-HDG 3/8" thimble
2 TRY-ACC-SLIDER (Optional) Safety slider for installer
1 SYS-USA7B (Optional) Suspension Harness

*NOM-009 mandates the use of systems that arrest accidental falls on a structure.

Recommended Grounding System for Tower and Equipment mounted on it (Not included)

Components
Quantity Model Description
1 TG45AB 45 A grounding electrode with electrode, filter, and H2Ohm compound
1 S610 Plastic inspection well
3 TGCR11 Eye connector
2 TGAB18 Rod connector
1 TGBUSG10 Grounding bus bar with insulators, 1000A capacity (without cabinet)

* It is recommended to use 4 AWG cal. coated copper cable (SLY-287-GRN) for grounding from the electrode to the tower. For equipment on the tower, 6 AWG cal. can be used (SLY-291-GRN).

Recommended Basic Lightning Protection System for Tower (Not included)

Components
Quantity Model Description
1 TGTDPC Lightning Rod Tip with Aluminum Mast (MASTIL1.2)
1 TG45AB 45 Amp Electrode with one bag of impedance improving compound (H2OHM), compass, and level
1 S610 Small plastic inspection well
1 ANTIOX Aerosol for terminal protection
3 TGCR11 Eye connector
2 TGAB18 Rod connector
2 TGAC Tower insulator

*The dipole-type tip offers a 72° protection cone below the coil. It is recommended for areas with low lightning incidence.

*2/0 gauge copper cable is recommended for integration (SLY-346-BLK). Considering an electrode installation at a maximum of 3 meters from the tower, approx. 8 meters are used.

See physical grounding + lightning rod connection diagram.

Recommendations

  • Ensure the installation is performed by a trained professional
  • Schedule a maintenance plan to check guy wire tension and adjust hardware
  • Do not install solar panels at a height greater than 6 meters. Check compatibility between solar cells and mounts
  • A stress study must be conducted when placing an eccentric load on the tower. This can cause excessive twisting and bending in the tower, leading to structural failure
  • The tower must be painted in orange-red and white, in 7 stripes of equal height, starting and ending with orange-red (SYSCOM does not perform tower painting)
  • It is recommended to illuminate the tower, at least at the top, with a red lamp

Representative Diagram: Guy Wire Installation Version 2.0

Guy wire installation diagram

Installation Images

Guyed tower installation

View full details