Skip to product information
1 of 1

SYSCOM TOWERS

6 m Floor-Mounted Guyed Tower Kit with STZ30 Electro-Galvanized Section (Guy wires not included).

6 m Floor-Mounted Guyed Tower Kit with STZ30 Electro-Galvanized Section (Guy wires not included).

Regular price $ 8,899.00
Regular price Sale price $ 8,899.00
Sale Sold out
Taxes included. Shipping calculated at checkout.
Quantity
Vendido por Glaretum, Proveedor de Servicio Autorizado Apple Paga con tarjeta, Apple Pay o PayPal ¿Dudas? Escríbenos por WhatsApp o llama al 800 461 0096

SYSCOM TOWERS

Key Features

  • Product manufactured under ISO 9001:2015 standard
  • High elevation / Low cost
  • 100% section-by-section assembly inspection
  • Electrolytic galvanization according to ASTM B-633 standard
  • Ideal for dry, corrosion-free areas

Physical Characteristics

  • Maximum Axial Load: 200 kg
  • Height: 6 meters (2 sections)
  • Wind resistance: 200 km/hr
  • Anti-corrosion protection: Electrolytic Galvanized (ASTM B-633)
  • Application: Outdoor (Desert or low-humidity areas)

Includes the following components

Quantity Model Description
2 STZ30 30 cm face width tower section
1 SCZ30P 30 cm tower top cap with lightning rod clamp
1 SBA30 Base for 30 cm tower
1 SAB30 Tower base anchor
1 SJB30 Guy wire bracket
3 SAP02 Floor anchor for guy wire
6 CUELLO-14-HDG Thimble for guy wire
18 NUDO-316-FJG 3/16' cable clamp

Guy wire not included. 32 meters of 1/8' guy wire (SRET-318-CAM) or larger diameters are recommended.

Turnbuckles not included. 3 turnbuckles of 1/2' x 6' are recommended (TEN1/2X6OGJ or TEN1/2X6OQJ).

FAILURE to use installation accessories such as Brackets, Tower Base, Tower Anchor, or Guy Wire Anchors is considered a voiding of the equipment warranty, and any additional adaptation is the responsibility of the installer.


Complementary Accessories (Not included)

Signaling/Lighting System (Not included):

Quantity Model Description
2 EIGSLSE Self-contained LED strobe with photocell, solar panel, and battery. Type L810
2 HLU3R2 Mount for EIGSLSE obstruction lamp

* The signaling standard dictates that the tower must be painted in 7 equal-sized bands; 4 bands in reddish-orange and 3 in white.

Lifeline system (Not included):

Quantity Model Description
1 SHE-LV Pair of mounting brackets
1 S-GULV Line guide
9 SRET-338 3/8' cable
6 NUDO-38FJG 3/8' forged wire rope clip
2 CUELLO-38-HDG 3/8' thimble
1 TRY-ACC-SLIDER (Optional) Safety slider for installer
1 SYS-USA7B (Optional) Suspension harness

*NOM-009 mandates the use of systems that arrest accidental falls on a structure.


Recommended Grounding System for Tower and Mounted Equipment (Not included)

Quantity Model Description
1 TG45AB 45 A grounding electrode with electrode, filter, and H2Ohm compound
1 S610 Plastic access box
3 TGCR11 Eye connector
2 TGAB18 Rod connector
1 TGBUSG10 1000A capacity grounding busbar with insulators (no cabinet)

* The use of 4 AWG insulated copper cable (SLY-287-GRN) is recommended for connecting the electrode to the tower. For equipment on the tower, 6 AWG (SLY-291-GRN) can be used.

Basic Recommended Lightning Protection System for Tower (Not included)

Quantity Model Description
1 TGTDPC Lightning rod tip with aluminum mast (MASTIL1.2)
1 TG45AB 45 Amp electrode with a bag of impedance-improving compound (H2OHM), compass, and level
1 S610 Small plastic inspection box
1 ANTIOX Aerosol for terminal protection
3 TGCR11 Eye connector
2 TGAB18 Rod connector
4 TGAC Tower insulator

*The dipole-type tip offers a 72° protection cone below the coil. It is recommended for low lightning incidence areas.
*2/0 gauge copper cable is recommended for integration (SLY-346-BLK). Considering an electrode installation at a maximum of 3 meters from the tower, approx. 8 meters are used.

See the physical ground + lightning rod connection diagram in the following DIAGRAM


Recommendations

  • Ensure that the installation is performed by a trained professional
  • Schedule a maintenance plan to check guy wire tension and tighten hardware
  • Do not install solar panels at a height greater than 6 meters. Check compatibility between solar cells and mounts
  • A stress study must be conducted when placing an eccentric load on the tower. This can cause excessive torsion and bending in the tower, leading to structural failure
  • The tower must be painted in orange-red and white tones, in 7 stripes of equal height starting and ending with orange-red (SYSCOM does not perform tower painting work)
  • It is recommended to illuminate the tower at least at the tip with a red lamp

Representative Diagram: Guy Wire Installation Version 2.0

Guy Wire Installation Diagram Version 2.0

Installation Images

Installation Images
View full details