SYSCOM TOWERS
6 m Floor-Mounted Guyed Tower Kit with STZ30 Electro-Galvanized Section (Guy wires not included).
6 m Floor-Mounted Guyed Tower Kit with STZ30 Electro-Galvanized Section (Guy wires not included).
Couldn't load pickup availability
Key Features
- Product manufactured under ISO 9001:2015 standard
- High elevation / Low cost
- 100% section-by-section assembly inspection
- Electrolytic galvanization according to ASTM B-633 standard
- Ideal for dry, corrosion-free areas
Physical Characteristics
- Maximum Axial Load: 200 kg
- Height: 6 meters (2 sections)
- Wind resistance: 200 km/hr
- Anti-corrosion protection: Electrolytic Galvanized (ASTM B-633)
- Application: Outdoor (Desert or low-humidity areas)
Includes the following components
| Quantity | Model | Description |
|---|---|---|
| 2 | STZ30 | 30 cm face width tower section |
| 1 | SCZ30P | 30 cm tower top cap with lightning rod clamp |
| 1 | SBA30 | Base for 30 cm tower |
| 1 | SAB30 | Tower base anchor |
| 1 | SJB30 | Guy wire bracket |
| 3 | SAP02 | Floor anchor for guy wire |
| 6 | CUELLO-14-HDG | Thimble for guy wire |
| 18 | NUDO-316-FJG | 3/16' cable clamp |
Guy wire not included. 32 meters of 1/8' guy wire (SRET-318-CAM) or larger diameters are recommended.
Turnbuckles not included. 3 turnbuckles of 1/2' x 6' are recommended (TEN1/2X6OGJ or TEN1/2X6OQJ).
FAILURE to use installation accessories such as Brackets, Tower Base, Tower Anchor, or Guy Wire Anchors is considered a voiding of the equipment warranty, and any additional adaptation is the responsibility of the installer.
Complementary Accessories (Not included)
Signaling/Lighting System (Not included):
| Quantity | Model | Description |
|---|---|---|
| 2 | EIGSLSE | Self-contained LED strobe with photocell, solar panel, and battery. Type L810 |
| 2 | HLU3R2 | Mount for EIGSLSE obstruction lamp |
* The signaling standard dictates that the tower must be painted in 7 equal-sized bands; 4 bands in reddish-orange and 3 in white.
Lifeline system (Not included):
| Quantity | Model | Description |
|---|---|---|
| 1 | SHE-LV | Pair of mounting brackets |
| 1 | S-GULV | Line guide |
| 9 | SRET-338 | 3/8' cable |
| 6 | NUDO-38FJG | 3/8' forged wire rope clip |
| 2 | CUELLO-38-HDG | 3/8' thimble |
| 1 | TRY-ACC-SLIDER | (Optional) Safety slider for installer |
| 1 | SYS-USA7B | (Optional) Suspension harness |
*NOM-009 mandates the use of systems that arrest accidental falls on a structure.
Recommended Grounding System for Tower and Mounted Equipment (Not included)
| Quantity | Model | Description |
|---|---|---|
| 1 | TG45AB | 45 A grounding electrode with electrode, filter, and H2Ohm compound |
| 1 | S610 | Plastic access box |
| 3 | TGCR11 | Eye connector |
| 2 | TGAB18 | Rod connector |
| 1 | TGBUSG10 | 1000A capacity grounding busbar with insulators (no cabinet) |
* The use of 4 AWG insulated copper cable (SLY-287-GRN) is recommended for connecting the electrode to the tower. For equipment on the tower, 6 AWG (SLY-291-GRN) can be used.
Basic Recommended Lightning Protection System for Tower (Not included)
| Quantity | Model | Description |
|---|---|---|
| 1 | TGTDPC | Lightning rod tip with aluminum mast (MASTIL1.2) |
| 1 | TG45AB | 45 Amp electrode with a bag of impedance-improving compound (H2OHM), compass, and level |
| 1 | S610 | Small plastic inspection box |
| 1 | ANTIOX | Aerosol for terminal protection |
| 3 | TGCR11 | Eye connector |
| 2 | TGAB18 | Rod connector |
| 4 | TGAC | Tower insulator |
*The dipole-type tip offers a 72° protection cone below the coil. It is recommended for low lightning incidence areas.
*2/0 gauge copper cable is recommended for integration (SLY-346-BLK). Considering an electrode installation at a maximum of 3 meters from the tower, approx. 8 meters are used.
See the physical ground + lightning rod connection diagram in the following DIAGRAM
Recommendations
- Ensure that the installation is performed by a trained professional
- Schedule a maintenance plan to check guy wire tension and tighten hardware
- Do not install solar panels at a height greater than 6 meters. Check compatibility between solar cells and mounts
- A stress study must be conducted when placing an eccentric load on the tower. This can cause excessive torsion and bending in the tower, leading to structural failure
- The tower must be painted in orange-red and white tones, in 7 stripes of equal height starting and ending with orange-red (SYSCOM does not perform tower painting work)
- It is recommended to illuminate the tower at least at the tip with a red lamp
Representative Diagram: Guy Wire Installation Version 2.0
Installation Images


