Wishlist

9 m Floor-Mounted Guyed Tower Kit with STZ30 Electro-Galvanized Section (Guy wires not included).

  • $ 9,999.00
  • Brand: SYSCOM TOWERS
  • Availability: 2 In stock
  • SKU: KTZ-30E-009

Key Features Product manufactured under ISO 9001:2015 standards High elevation / Low cost. 100% section-by-section assembly inspection. Electrolytic galvanizing in accordance with ASTM B-633 standards. Ideal for dry, corrosion-free areas....

Tags: categoria:Redes e IT , marca:SYSCOM TOWERS , proveedor:Syscom , Redes Y Conectividad , sku:KTZ-30E-009 , supplier:Syscom , syscom

Logo SYSCOM TOWERS

Key Features

  • Product manufactured under ISO 9001:2015 standards
  • High elevation / Low cost.
  • 100% section-by-section assembly inspection.
  • Electrolytic galvanizing in accordance with ASTM B-633 standards.
  • Ideal for dry, corrosion-free areas.

Physical Characteristics

  • Maximum Axial Load: 200 kg.
  • Height: 9 meters (3 sections).
  • Wind Resistance: 200 km/h.
  • Anti-corrosion protection: Electrolytic Galvanizing (ASTM B-633).
  • Application: Outdoors (desert or low humidity areas).

Includes the following components

Quantity Model Description
3 STZ30 Tower section with 30 cm face width.
1 SCZ30P 30 cm tower top with lightning rod clamp.
1 SBA30 Base for 30 cm tower.
1 SAB30 Anchor for tower base.
2 SJB30 Guy wire clamping flange.
3 SAP02 Floor anchor for guy wire.
12 CUELLO-14-HDG Thimble for guy wire
36 NUDO-316-FJG 3/16' cable clip.

Guy wire not included. We recommend 75 meters of 1/8' guy wire (SRET-318-CAM) or larger diameters.

Turnbuckles not included. We recommend 6 turnbuckles of 1/2' x 6'. (TEN1/2X6OGJ or TEN1/2X6OQJ).

**Failure to use installation accessories such as flanges, tower base, tower anchor, or guy anchors will void the equipment warranty, and any additional modifications are the sole responsibility of the installer.**

Complementary accessories (Not included)

Signaling/Lighting system (Not included)

Lifeline system (Not included)

Quantity Model Description
1 SHE-LV Pair of mounting brackets
1 S-GULV Line guide
12 SRET-338 3/8' cable
6 NUDO-38FJG 3/8' forged cable clip
2 CUELLO-38-HDG 3/8' thimble
1 TRY-ACC-SLIDER (Optional) Safety slider for installer.
1 SYS-USA7B (Optional) Suspension harness.

*NOM-009 mandates the use of systems to prevent accidental falls from a structure.

New! Lightning Rod + Grounding kit with cable. LINKEDPRO brand (Not included)

KLP-TZ09-PRO .- All included! Ideal for 9 m towers with crown dipole, wiring, and electrodes.

Or you may individually quote the following Grounding or Lightning rod components:

Recommended Grounding System for Tower and Mounted Equipment (Not included)

Quantity Model Description
1 TG45AB 45 A grounding electrode with electrode, filter, and H2Ohm compound.
1 S610 Plastic access box.
3 TGCR11 Eye connector.
2 TGAB18 Rod connector.
1 TGBUSG10 1000A capacity busbar with insulators (without enclosure).
* We recommend using 4 AWG coated copper wire (SLY-287-GRN) for grounding from the electrode to the tower. For equipment on the tower, you can use 6 AWG (SLY-291-GRN).

Recommended Basic Lightning Protection System for Tower (Not included)

Quantity Model Description
1 TGTDPC Lightning rod with aluminum mast (MASTIL1.2)
1 TG45AB 45 Amp. electrode with a bag of impedance-improving compound (H2OHM), compass, and level.
1 S610 Small plastic inspection box.
1 ANTIOX Aerosol for terminal protection.
3 TGCR11 Eye connector.
2 TGAB18 Rod connector.
2 TGAC Tower insulator.
*The dipole tip offers a 72° protection cone below the coil. Recommended for areas with low lightning incidence.
*2/0 gauge copper cable is recommended for integration (SLY-346-BLK). Considering an electrode installation at a maximum of 3 meters from the tower, approximately 8 meters are used.

See the Physical Ground + Lightning Rod connection diagram in the following DIAGRAM.

Recommendations

  • Ensure the installation is performed by a trained professional.
  • Schedule a maintenance plan to check guy wire tension and tighten hardware.
  • Do not install solar panels at a height greater than 6 meters. Check compatibility between solar cells and mounts.
  • A stress study must be performed when an eccentric load is placed on the tower. This can cause excessive torsion and bending in the tower, leading to structural failure.
  • The tower must be painted in orange-red and white, in 7 stripes of equal height, starting and ending in orange-red (SYSCOM does not perform tower painting).
  • It is recommended to illuminate the tower, at least at the tip, with a red lamp.

Representative Diagram: Guy Wire Installation Version 2.0

Guy Wire Installation Diagram Version 2.0

Installation Images

Installation Images

Recently viewed