Skip to product information
1 of 1

SYSCOM TOWERS

9 m Floor-Mounted Guyed Tower Kit with STZ30G Hot-Dip Galvanized Section. (Guy wires not included).

9 m Floor-Mounted Guyed Tower Kit with STZ30G Hot-Dip Galvanized Section. (Guy wires not included).

Regular price $ 16,099.00
Regular price Sale price $ 16,099.00
Sale Sold out
Taxes included. Shipping calculated at checkout.
Quantity
Vendido por Glaretum, Proveedor de Servicio Autorizado Apple Paga con tarjeta, Apple Pay o PayPal ¿Dudas? Escríbenos por WhatsApp o llama al 800 461 0096

Logo SYSCOM TOWERS

Key Features

  • Product manufactured under ISO 9001:2015 standards.
  • High elevation / Low cost.
  • 100% section-by-section assembly inspection.
  • Hot-dip galvanized in accordance with NMX-H-004-SCFI-2008.
  • Ideal for high-humidity coastal zones or industrial areas.

Physical Specifications

  • Maximum Axial Load: 200 kg.
  • Height: 9 meters (3 sections).
  • Wind Resistance: 200 km/h.
  • Anti-corrosive protection: Hot-dip galvanized (NMX-H-004-SCFI-2008).
  • Application: Outdoor (Humid zones).
Includes the following components
Quantity Model Description
3 STZ30G Tower section, 30 cm face width.
1 SCZ30PG 30 cm tower top with lightning rod set screw.
1 SBA30G Base for 30 cm tower.
1 SAB30G Anchor for tower base.
2 SJB30G Guy wire mounting flange.
3 SAP02G Ground anchor for guy wire.
12 CUELLO-14-HDG Thimble for guy wire.
36 NUDO-316-FJG 3/16" wire rope clip.

Does not include guy wire.

75 meters of 1/8' guy wire (SRET-318-CAM) or larger diameters are recommended: SRET-318-CAM

Does not include turnbuckles

6 turnbuckles of 1/2' x 6' are recommended: TEN1/2X6OGJ or TEN1/2X6OQJ.

Note: Failure to use installation accessories such as flanges, tower base, tower anchor, or guy anchors will void the equipment warranty, and any additional modifications are the responsibility of the installer.

Complementary Accessories (Not included)

Signaling/Lighting System (Not included):

Quantity Model Description
2 EIGSLSE Autonomous LED strobe light with photocell, solar panel, and battery. Type L810.
2 HLU3R2 Mount for EIGSLSE obstruction light

*Signaling standards dictate that the tower must be painted in 7 equal-sized bands; 4 bands in orange-red and 3 in white.

Lifeline System (Not included)
Quantity Model Description
1 SHE-LV Pair of mounting brackets
1 S-GULV Line guide
12 SRET-338 3/8" cable
6 NUDO-38FJG 3/8" forged wire rope clip
2 CUELLO-38-HDG 3/8" thimble
1 TRY-ACC-SLIDER (Optional) Safety Slider for installer.
1 SYS-USA7B (Optional) Suspension harness.

*NOM-009 mandates the use of fall arrest systems when working on a structure.

New! Lightning rod + Grounding system kit with cable. LINKEDPRO brand (Not included)

KLP-TZ09-PRO - All included! Ideal for 9 m towers with dipole, wiring, and electrodes.

You can also quote the following Grounding or Lightning Rod components individually:

Recommended Grounding System for Tower and Mounted Equipment (Not included)
Quantity Model Description
1 TG45AB 45A grounding electrode with Electrode, Filter, and H2Ohm compound
1 S610 Plastic inspection box.
3 TGCR11 Eyelet connector
2 TGAB18 Connector for rod
1 TGBUSG10 Busbar with 1000A capacity insulators (No cabinet)

* Use of 4 AWG coated copper cable (SLY-287-GRN) is recommended for grounding the electrode to the tower. For equipment on the tower, 6 AWG (SLY-291-GRN) can be used.

Recommended Basic Lightning Rod System for Tower (Not included)
Quantity Model Description
1 TGTDPC Lightning rod tip with aluminum mast (MASTIL1.2)
1 TG45AB 45 Amp electrode. With one bag of impedance-improving compound (H2OHM), compass, and level.
1 S610 Small plastic inspection box.
1 ANTIOX Aerosol for terminal protection.
3 TGCR11 Eyelet connector.
2 TGAB18 Connector for rod.
2 TGAC Tower insulator.

*The dipole-style tip offers a 72° protection cone below the coil. Recommended for areas with low lightning incidence.

*2/0 gauge copper cable is recommended for integration: SLY-346-BLK. Considering a maximum electrode installation distance of 3 meters from the tower, approx. 8 meters are used.

See the Earth Ground + Lightning Rod connection diagram in the following DIAGRAM.

Recommendations

  • Ensure that the installation is performed by a trained professional.
  • Schedule a maintenance plan to check guy wire tension and tighten hardware.
  • Do not install solar panels at a height greater than 6 meters. Check the compatibility between solar cells and mounts.
  • A stress analysis must be performed when placing an eccentric load on the tower. This can cause excessive torsion and bending in the tower, leading to structural failure.
  • The tower must be painted in aviation orange and white, in 7 bands of equal height, starting and ending with aviation orange (SYSCOM does not perform tower painting).
  • It is recommended to light the tower at least at the top with a red lamp.

Representative Diagram: Guy Wire Installation Version 2.0

Guy Wire Installation Diagram Version 2.0

Installation Images

Installation Images

View full details