Lightning Rod Kit with Accessories for 80 m Diameter Protection.
- $ 31,199.00
- Brand: TOTAL GROUND
- Availability: Out of stock
- SKU: KIT-MASTER-ALU-V2
The KDA-LU lightning rod system is a lightning protection system (LPS). It serves to intercept, conduct, and dissipate lightning current and internal elements through bonding, shielding, and grounding. The goal...
Tags: categoria:Energía / Herramientas , Energía Y Alimentación , marca:TOTAL GROUND , proveedor:Syscom , sku:KIT-MASTER-ALU-V2 , supplier:Syscom , syscom

The KDA-LU lightning rod system is a lightning protection system (LPS). It serves to intercept, conduct, and dissipate lightning current and internal elements through bonding, shielding, and grounding. The goal of an LPS is to reduce the risk of damage to people and other living beings, as well as to structures, buildings, and their contents.
Offers an 80m protection diameter.
Components included in the kit
Bronze connector
Rod connector
Protective spray for connectors View product
Electrode inspection pit View product
Flat base with integrated 2m mast for lightning rod terminal View product
Complementary accessories (Not included)
THW-LS Coated Copper Cable, 2/0 AWG gauge View product
Lightning strike counter View product
KDALU Terminal Description
Lightning rod terminal and current conductor designed in high-conductivity aluminum, which is part of an external lightning protection system (ELPS), to reduce the risk of damage that a lightning strike can cause.
It seeks to reduce the incidence of strikes by up to 95% due to its magneto-active operation.
It is recommended to take into account the NMX-J-549-ANCE-2005 standard, which suggests that a lightning protection system (LPS) must have an internal lightning protection system (ILPS) and an external lightning protection system (ELPS).
The KDA-LU terminal is part of the external protection, while the internal part corresponds to the transient surge suppressors (TSS) from the TOTAL GROUND brand.

Training videos
WEBINAR 1: BASICS OF ELECTRICAL GROUNDING AND LIGHTNING RODS (STARTS AT MIN. 14)
WEBINAR 2: INSTALLATION OF ELECTRICAL GROUNDING AND LIGHTNING RODS
WEBINAR 3: TOTAL GROUND LIGHTNING PROTECTION SYSTEMS