Wishlist

3/8" Forged Wire Rope Clip, Stainless Steel.

  • $ 199.00
  • Brand: SYSCOM TOWERS
  • Availability: In stock
  • SKU: NUDO-38-FJSS

Key Features Material: Stainless steel Recommended for: 3/8' strands (SRET338CAM or SRET38DA) Recommended use per tie-off: 3 pieces Ideal for: Heavy loads Applications: Suspension or fastening of guyed towers, masts,...

Tags: categoria:Redes e IT , marca:SYSCOM TOWERS , proveedor:Syscom , Redes Y Conectividad , sku:NUDO-38-FJSS , supplier:Syscom , syscom

Key Features

  • Material: Stainless steel
  • Recommended for: 3/8' strands (SRET338CAM or SRET38DA)
  • Recommended use per tie-off: 3 pieces
  • Ideal for: Heavy loads
  • Applications: Suspension or fastening of guyed towers, masts, poles, and similar structures.

Safety Notes

  • Use the same size clip for the same wire rope size.
  • Never use malleable iron clips in critical or heavy-duty applications, or for overhead loads, such as slings, suspension lines, guy lines, tow lines, load securement, scaffolding, etc.
  • Malleable iron clips are for making terminations:
    • Only for light-duty and non-critical applications such as light loads, handrails, trellises, area fencing, etc.
    • Apply an initial load to test the assembly. This load should be equal to or greater than the weight it will support. Then check and retighten the nuts to the recommended torque.
Wire Rope Clip Installation Method
  1. Turn back the wire rope the necessary length around the thimble, and install the first clip at a distance from the dead end of the wire equal to the width of the clip base. Tighten the nuts alternately to the specified torque.
  2. When only two clips are necessary, install the second one as close as possible to the loop or thimble, and tighten the nuts alternately to the specified torque. When more than two clips are required, install the second clip as close as possible to the loop or thimble and tighten the nuts firmly without applying full torque.
  3. Install all required clips between the first two with equal spacing between them, and positioned in the same orientation. Ensure the nuts on all clips are tightened to the specified torque.
  4. Finally, apply a load equal to or greater than the expected working load to test the assembly. Immediately check, and if necessary, retighten the nuts to the recommended torque using a torque wrench.

Recently viewed